Deutsche Umschlaggesellschaft Schiene-Straße (DUSS) has commissioned a new 320-tonne gantry crane at its Berlin terminal in Großbeeren.
The crane reaches maximum speed within 10 seconds and is equipped with updated drive technology and assistance systems. It expands handling capacity at the site, which forms part of the Großbeeren freight village south of Berlin.
With the additional crane, annual handling capacity at the DUSS Terminal Berlin increases to 130,000 loading units. The site now operates three gantry cranes, enabling existing traffic to be processed and providing capacity for further intermodal volumes.